
Estate Driveway Gates in Walnut Creek.
Estate driveway gates for Walnut Creek — mid-century, Craftsman, or traditional arched. Manual or motor-automated.
- County
- Contra Costa
- Price range
- $12k–$52k
- Lead time
- 8–12 weeks
- Consult
- On-site, free



Estate Driveway Gates in Walnut Creek, CA
Three design languages, one estate gate.
The double swing is our estate driveway statement piece — two leaves meeting at the centerline, sized for openings 12 to 20 feet. We build it in three design languages: mid-century modern with clean horizontal lines and minimal ironwork; Craftsman with heavier timber and exposed joinery; and traditional estate with custom arches and, on the right property, an arbor built above the opening.
In Walnut Creek, walnut creek runs from mid-century hillside builds in northgate and walnut heights to traditional ranches and contemporary new construction closer to town. Hot dry I-680-corridor summers and expansive clay soils dictate UV-stable finishes and pier-and-footing systems sized for soil movement. Manual or motor-automated is a decision made per site — long drives almost always warrant automation, shorter formal approaches sometimes read better manual.
Frames are mortise-and-tenon joinery in Sapele mahogany over redwood, hung on hardware sized to the loaded leaf. Most Walnut Creek work is city-permit only; hillside overlay zones can add design review, which we prepare in-house. We build regularly in Northgate, Saranap, Tice Valley, Walnut Heights, Parkmead, and the Woodlands.
Walnut Creek homes range from mid-century hillside builds to traditional ranches and contemporary new construction. We work throughout Northgate, Saranap, Tice Valley, Walnut Heights, Parkmead, and the Woodlands.
"Heartwood designed and installed a Sapele swing gate that completely changed the front of our home. The crew was tidy, the joinery is gorgeous, and the FAAC operator has been flawless through two summers."
- Founded
- 2016
- Gates
- 500+ delivered
- From Concord HQ
- ~15 mi
Estate Driveway Gates in Walnut Creek — answered.
Begin your double swing estate gate.
Tell us about your Walnut Creek property. Same-day reply on consultations booked before 2pm, next business day after. Currently booking Fall 2026.
