
Estate Driveway Gates in Orinda.
Estate driveway gates for Orinda — mid-century, Craftsman, or traditional arched. Manual or motor-automated.
- County
- Contra Costa
- Price range
- $9k–$30k
- Lead time
- Lead times average 4 to 8 weeks from approved design. Contact us for an exact timeline for your project.
- Consult
- On-site, free



Estate Driveway Gates in Orinda, CA
Three design languages, one estate gate.
The double swing is our estate driveway statement piece — two leaves meeting at the centerline, sized for openings 12 to 20 feet. We build it in three design languages: mid-century modern with clean horizontal lines and minimal ironwork; Craftsman with heavier timber and exposed joinery; and traditional estate with custom arches and, on the right property, an arbor built above the opening.
In Orinda, orinda is hillside country — driveways climb, curve, and cross drainage. site rules the design. Berkeley Hills fog cycles and steep decomposed-granite lots demand drainage-first footings and finishes that handle daily dew without cupping. Manual or motor-automated is a decision made per site — long drives almost always warrant automation, shorter formal approaches sometimes read better manual.
Frames are mortise-and-tenon joinery in Sapele mahogany over redwood, hung on hardware sized to the loaded leaf. We build regularly in Orinda Downs, Sleepy Hollow, Glorietta, the Orinda Country Club area, and Ivy Drive.
Estate-scale Mediterranean, Tudor revival, and modern hillside homes dominate Orinda's tree-lined private drives. We work throughout Orinda Downs, Sleepy Hollow, Glorietta, the Orinda Country Club area, and Ivy Drive.
"We compared three builders. Heartwood was the only one who showed up with a 3D rendering and a finish sample we could leave outside for a week. Three years in and the gate still looks new."
- Founded
- 2016
- Gates
- 500+ delivered
- From Concord HQ
- ~15 mi
Estate Driveway Gates in Orinda — answered.
01How much does a double swing estate gate cost in Orinda?
02How long does a double swing estate gate take in Orinda?
03What materials do you build in?
04Manual or motor-automated — how do we decide?
Begin your double swing estate gate.
Tell us about your Orinda property. We strive to respond the same day to inquiries received before 2pm. Currently booking Fall 2026.
