
Custom Driveway Gates in Moraga.
Custom driveway gates for Moraga estates — engineered to the opening, drawn to the architecture behind it.
- County
- Contra Costa
- Price range
- $15k–$60k
- Lead time
- Lead times average 4 to 8 weeks from approved design. Contact us for an exact timeline for your project.
- Consult
- On-site, free



Custom Driveway Gates in Moraga, CA
Engineered to the opening. Drawn to the house.
A driveway gate is engineered around the opening. Swing, bi-parting, bi-fold — every configuration starts with a site survey: opening width, approach grade, soil, utility lines, swing or slide clearance. In Moraga, moraga homes in rheem valley, campolindo, and sanders ranch sit on sloped, oak-shaded lots where the driveway rolls with the grade.
Rolling clay soils along Bollinger Canyon heave meaningfully in the wet season; pier depth and reinforcement are specified to match. Frame is welded steel or Sapele mahogany over redwood, joined mortise-and-tenon joinery where the design shows wood. Automation (when specified) is UL325-compliant with loop detectors, photo eyes, and the access-control stack your architecture calls for.
We work throughout Rheem Valley, Campolindo, Sanders Ranch, the Moraga Country Club area, and Miramonte. Lead times average 4 to 8 weeks from approved design. Contact us for an exact timeline for your project.
Moraga's housing stock leans mid-century ranch, Eichler-influenced modern, and traditional Craftsman on generous lots inside the Rheem Valley basin. We work throughout Rheem Valley, Campolindo, Sanders Ranch, the Moraga Country Club area, and Miramonte.
"Heartwood engineered a bi-parting Sapele driveway gate for our Sanders Ranch home that handles the slope perfectly. Three winters in and the finish still looks the day it was installed."
- Founded
- 2016
- Gates
- 500+ delivered
- From Concord HQ
- ~15 mi
Custom Driveway Gates in Moraga — answered.
01How much does a driveway gate cost in Moraga?
02How long does a driveway gate take in Moraga?
03What materials do you build in?
04Swing, sliding, or bi-fold — which is right?
Begin your driveway gate.
Tell us about your Moraga property. We strive to respond the same day to inquiries received before 2pm. Currently booking Fall 2026.
